Sunday, December 9, 2007

The Basic Problem Of Any

Even if the grading is for a stone or concrete terrace the topsoil should be saved for other areas that are thin or in the flower garden.Subsoil Drainage for Lawns and GardensWhere the subsoil is thick or heavy clay, a drainage system should be installed. For almost all terraces, it is a good idea to tamp down the soil, and pour a quantity of gravel or crushed rock as a base. A run off area is even more important if you are on low ground, on which water from higher areas flows. If you are on high ground, an underground pipe leading out over a slope will be enough. Once the topsoil is stripped away, the subsoil should be graded to the desired contours, leaving sufficient space for adding the topsoil that was removed. Any slight rise left after restoring topsoil will disappear after the first winter.In leveling an area for a terrace, there is no need to add subsoil drainage.The first step in developing a drainage system is to find an area to receive the flow. Terraces require a level area as a rule, but the grade sloping away from the house should be maintained. For lawns, a gentle slope works best, most experts recommend a minimum of six inches in slope for every 100 feet in lawn. The extent of the grading depends on the condition of the ground, the desired ground levels and the attention that must be given to any extreme slopes. Such slopes assure proper drainage, set off the house and make for easier maintenance.When backfilling, put all the subsoil you have removed back in and tamp it down, if necessary. The dry well is nothing more than a pit, four to six feet in depth and diameter, filled with gravel. This area should be marked after it is covered, so that you know where it is if water starts to back up on your lawn.Several sizes of corrugated pipe are available for subsoil drainage and should be used according to the manufacturers specifications paying attention to the minimum effective grade for effective drainage. Adhering as closely as possible to the natural contours in grading will cut expenses considerably.The best time to do grading is when you undertake construction of your house. Whether you are planning a lawn, garden or terrace, grading comes first. It is a simple matter to ask for a few more inches between the entrance level and the ground level that will insure the easy development of a grade away from the house which will improve the appearance of your surroundings and help protect your basement from flooding.. Once you have done the rough work, use a long board as a straight edge along the ground to insure accuracy.Rough Grading and DrainageIn lawn, garden or terrace construction rough grading is the first step.The basic problem of any landscaping is the initial grading of the soil. This same guideline can be applied to stone terraces as well, to prevent pools of water in rainy weather.For do-it-yourselfers, perhaps the easiest drainage run-off is the dry well.Measuring Your GradingIf you have a grade to level, rather than eyeballing it, use a piece of twine or string that is pulled tight between two stakes imbedded in the ground as a guide. Even in sandy soil, it is a good idea, since it helps create a more even distribution of moisture throughout the lawn or garden area.The first step is to strip and separate topsoil from the areas where the level is going to be changed. Grading means building a slope or slopes into your.

No comments: